Building engineers conduct geotechnical investigations before beginning any construction or demolition work on a site. Soil samples are collected and images are taken using advanced equipment such as GPR (Ground Penetration Radar) to locate buried utilities so that they are not damaged during the digging process. The soil samples collected by the geotechnical investigations team are tested in a laboratory to determine their various properties. Knowing these characteristics will help building engineers in determining the best method of excavation, the suitability of foundation work for structures, and the material most appropriate for use in a project. Solo Resource Recovery is Australia's leading provider of waste management solutions. Geotechnical engineers and geologists from Solo Waste Management Company collaborate with structural engineers to provide geotechnical investigations that serve as a starting point for early project planning, ensuring that underground utilities re...
Posts
Showing posts with the label Subsurface utility engineering